In the project, for the construction of the “Kalbajar GDS” gas pipeline branch, which will pass through Agdam, Aghdara and Kalbajar regions, metal pipes with a length of 43000 meters and dimensions of DN530x7mm were installed. This project was implemented in order to support the reconstruction works in the area by strengthening the gas supply of the region.