As a part of the project, 3000 meters long and DN530x8mm diameter metal pipes connected with 1500 meters long and DN820x10mm diameter metal pipes were used. While these pipes form the main transport lines for water transfer, they were also used for a sewage pumping station and two 1000m³ water reservoirs.
For the successful implementation of the project, all mechanical and electrical installations essential to the safe and efficient operation of the supply have been expertly executed.