In order to supply and install the mechanical and technological equipment that will be used in the Shusha Gas distribution station in the project, welding works of metal pipes with a length of 1513 meters and a diameter of DN325x6mm were performed. Also, in support of the reconstruction works in the Karabakh territory, the construction of the main gas pipeline to the city of Shusha was ensured.