As a part of the project, HDPE pipes of different diameters (DN160-DN630) with a total length of 8855 meters were installed. In addition, mechanical equipment and 4 D-type pumps were installed in the pump house. As part of the project, the preparation of 6 Pivot centers and other related construction works were also performed in the area.