adminensoll +25 Replacement of Pumps with New Units at the Pump Station Located at the Mashtaga Water Treatment Facility Site 25May
adminensoll +41.0 Installation of Mechanical Equipment at the Water Reservoir with a Capacity of 2×10,000 m³ at Water Reservoir Site No. 5 28Jul