+25 Replacement of Pumps with New Units at the Pump Station Located at the Mashtaga Water Treatment Facility Site
Within the scope of the project, technical modernization of the pump station and equipment upgrade works were carried out.
The completed works included the supply and installation of 2 centrifugal pumps (Q=1800 m³/hour, H=45 m, N=315 kW), the supply and installation of 2 Soft Starter panels (70 A, 710 kW), as well as the installation of mechanical and electrical equipment within the pump station.
As a result of the works carried out, the operational stability and technical reliability of the pump station were enhanced, ensuring more efficient and uninterrupted operation of the water conveyance system.