+41.0 Installation of Mechanical Equipment at the Water Reservoir with a Capacity of 2x10,000 m³ at Water Reservoir Site No. 5
Within the scope of the project, mechanical equipment was installed at the 2 x 10,000 m³ capacity water reservoirs located in the Mashtaga settlement, and a 141-meter-long metal pipeline was laid. The main objective of the project is to enhance the technical stability of the water reservoirs and ensure their coordinated operation with the pump systems.